[Code 1962 §9-1; CC 1979 §9-1; Ord. No. 724 §1, 7-15-1969; Ord. No. 921 §2, 5-18-1976; Ord. No. 87-16, 8-18-1987; Ord. No. 93-20 §1, 2, 6-1-1993; Ord. No. 14-2000 §1, 4-18-2000; Ord. No. 195-2005 §1, 1-18-2005; Ord. No. 03-2013 §1, 1-22-2013; Ord. No. 22-2019, 4-2-2019]
A certain document, a copy of which is on file in the office of the Building Inspector of the City of Neosho, Missouri, being marked and designated as "The National Electrical Code, 2017 Edition," as published by the National Fire Protection Association, Inc., be and is hereby adopted as the Electrical Code of the City of Neosho, Missouri, for the control of electrical wiring, electrical devices or electric material; and each and all of the regulations, provisions, penalties, conditions and terms of said National Electrical Code are hereby referred to, adopted and made a part hereof, as if fully set out in this Section, except as otherwise provided by this Chapter.